Micro fulfillment network design for quick commerce in Greater Jakarta
How many dark stores a 30 minute delivery promise needs in Greater Jakarta, where a longer service tier beats building more, and how far an electric fleet cuts last mile CO2e.

- 92.5%Proxy demand within a 30 minute ride of 30 optimised hubs at 20 km/h; 25 hubs already reach 90.6%
- 81.2%The same 30 hubs if riders average 15 km/h, or lose about 7 minutes to picking and handover
- 99%Share of the demand left outside 30 minutes that sits in the Bogor, Bekasi and Tangerang regencies
- 58 to 68%Lower CO2e per delivery from a fully electric fleet on the same network, grid at 870 and 650 g/kWh
Problem
Quick commerce promises delivery in 30 minutes. In a metropolitan region the size of Greater Jakarta, an operator has to decide how many dark stores to open, where to put them, where the promise stops paying for itself, and what the network does to last mile emissions. Every extra hub costs rent and staff, so the question is where the next hub still buys coverage and where a slower service tier is the cheaper answer.
Approach
A 1 km demand proxy is built in Google Earth Engine. Each cell’s WorldPop population is weighted by a propensity index from VIIRS night lights, Dynamic World built-up probability, OpenStreetMap road access and commercial POI density, so orders follow people and are higher where people are more urban and better served. On that surface the DKI Jakarta cities hold 34% of demand, close to their share of the region’s population.
Every built-up cell is a candidate site. A demand weighted p-median model, solved by greedy construction and vertex substitution over all 7,096 demand cells, selects networks of 5 to 60 hubs. A greedy maximal covering solution for the same hub counts shows how much coverage a network aimed only at coverage could reach.
Results
Thirty hubs put 92.5% of proxy demand within a 30 minute ride at 20 km/h. The greedy coverage network reaches 95.7% with the same count, so placing hubs to shorten trips gives up little coverage.

Coverage rises quickly and then flattens. Fifteen hubs cover 81%, 25 hubs 90.6%, and doubling from 30 to 60 hubs adds only enough to reach 97.2%. Rider speed matters as much as hub count: at 15 km/h, or with about 7 minutes of each 30 lost to picking and handover, the same 30 hubs cover 81.2%, and even 45 hubs reach only 90.0%.


What is left uncovered is concentrated (Moran’s I = 0.77). The Bogor regency leaves 25% of its demand outside the 30 minute reach, the Bekasi regency 23% and the Tangerang regency 19%. Together these three fringe regencies hold 99% of all the demand the network does not reach. Inside the cities the 30 minute promise is already met almost everywhere.


On the 30 hub network an average delivery is 5.7 km one way, against 6.9 km with 20 hubs. A petrol fleet emits about 410 g CO2e per delivery over that distance. Electrifying half the fleet cuts that by 29 to 34%, and a fully electric fleet by 58 to 68%, depending on whether charging draws on a grid at 870 or 650 gCO2e per kWh.

What to do with it
Build to about 25 hubs, not 60. If riders average 20 km/h, 25 hubs reach 90 percent of demand within 30 minutes, and every hub after that adds less than half a point. The money saved on the last 30 hubs is better spent elsewhere in the operation.
Spend first on minutes inside the store. Losing about 7 minutes to picking and handover costs as much coverage as dropping from 30 hubs to 15. Faster picking, staged orders and riders waiting at the hub at peak hours protect the promise more cheaply than new sites.
Do not chase the 30 minute promise in the fringe regencies. Almost all of the uncovered demand is in Bogor, Bekasi and Tangerang regencies, where it is spread thin. A 45 minute tier served from the existing network reaches 97.6%, and a few rider staging points at the edge of the covered area can carry peak demand without the rent of a full store.
Electrify inside the cities first. In the dense core the trips are short and the hubs are close together, which suits small electric motorcycles and shared battery swapping. A fully electric fleet cuts per delivery CO2e by more than half even on the coal-heavy grid case, and the cut grows as the Java-Bali grid gets cleaner.
Before any lease is signed, the hub locations need a second pass with real order data, travel times from a routing engine and the rent and floor space available in each search area.
Correction
The first version of this analysis reported 76.3 percent coverage with 30 hubs and a coverage ceiling that more hubs could not break. It optimised and measured coverage over only the 2,500 highest-demand cells, with candidate sites limited to the densest 30 percent of the region. A second audit found that demand had been weighted by the composite index alone, without population, so a sparsely settled fringe cell carried a third of the weight of a dense city cell and the fringe regencies held more demand than all of DKI Jakarta. Demand is now population weighted by the index. That version also reported emission cuts of up to 95 percent against a single central hub serving the whole region, a network no operator runs; reductions are now given against a petrol fleet on the same network, under two grid factors.
Limitations
What these results should not be used for.
- Demand is a proxy, population weighted by an index of night lights, built-up probability, road access and commercial POIs. It is not platform order volume, and real order data would change where the hubs go.
- Distance is straight-line distance times a detour factor of 1.35, not time dependent routing on the road network, so congestion is represented only through the rider speed scenarios.
- Emissions are scenario values per delivery over the one-way demand-weighted distance, with assumed factors of 72 gCO2e per km for a petrol motorcycle and 0.035 kWh per km for an electric one. They are not measured company emissions.
- Hub locations are cell centroids. Rent, floor space and zoning are not modelled, so each selected site is a search area, not an address.